The Site
This site has been identified by looking at several different criteria, both enviromental and technical.
Environmental
- landscape and visual impact
- ecology
- noise
- cultural heritage
- hydrology (water studies)
- Ministry of Defence, Civil Aviation Authority, Electromagnetic Interference (TV signals)
- traffic management
- cumulative impact (effect of more than one wind energy development)
- local benefits
Technical
- wind speed
- grid connection
- site access
- existing land use
- land availability
Further Studies
Initial feasibility work suggests that the above criteria will be met at the site, and more detailed studies are currently being carried out to confirm this.
Subject to the results of these studies and the results of consultation with various stakeholders, a planning application for the wind farm may be submitted.
|
|